Shown is a diagram of an efficient site layout to maximize production. The lumber and slab areas can vary, but the logs need to be positioned as shown for loading, preferably on 4x4 runners. The log loaders are on the driver's side of the tow vehicle. I will need room to either back up alongside of the logs or room to drive past the logs. The work area needs to be fairly flat. (If viewing on a phone, view in landscape mode)